This is our pics from a house we bought and all the fixing we have to do :D
Saturday, July 18, 2009
Got the grommit installed. Now to start running all the wires
Friday, July 17, 2009
Also got the towl rack put back up. Lol. Look at those bling washers :-)
Here is the closet ceiling for the sever rack. I had to bring power in for the equipment. It's a bit of a funky pic
Thursday, July 16, 2009
Starting on the home network setup. Planning on having a network drop in every room, 4 in the living room and 4 in the office. That should be enough. :D
Tuesday, July 14, 2009
Put up some closets too. Half is missys and half is mine. Much better looking then the old stuff
Finally finished up the doorway to the hallway.
Sunday, July 5, 2009
Got the new light installed in the kitchen. Had to run wires for the switch. Not to bad of work, but being in the attic was damn hot. Think it was almost 120deg up there